Mumbai Metro Line 6 — Viaduct & Elevated Stations

Swami Samarth Nagar–JVLR–SEEPZ–Kanjurmarg, Mumbai · Ongoing

Metro & Rail

Mumbai Metro Line 6 — Viaduct & Elevated Stations

Viaduct and elevated station construction on Metro Line 6, spanning the stations at Mahakali Caves, Saki Vihar Road, Rambaug and Powai Lake.

Project overview

Viaduct and elevated station construction on Metro Line 6, spanning the stations at Mahakali Caves, Saki Vihar Road, Rambaug and Powai Lake.

Line 6 runs from Swami Samarth Nagar through JVLR and SEEPZ to Kanjurmarg. Eagle Infra's package covers part design and construction of the viaduct together with elevated stations along the corridor.

The work spans the full civil cycle — pier foundations and columns, cast-in-place pier caps, a dedicated casting yard and batching plant, U-girder fabrication, night pours, and girder launch and erection.

Scope of work

Part design and construction of viaduct and elevated stations, excluding architectural finishing and pre-engineered steel roof structures

Project gallery

8 images

  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 1
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 2
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 3
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 4
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 5
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 6
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 7
  • Mumbai Metro Line 6 — Viaduct & Elevated Stations — site photograph 8

Related work

More in metro & rail and beyond.

All projects →